Riverina Poultry Farms – Pump Shed

Riverina Poultry Farms – Pump Shed

November 18, 2015IrribizNo comments

The connection into Murrumbidgee Irrigation System and the mainlines back to the farm dams and concrete processing plant is a large undertaking. We look forward to the next phases in the project as the sheds start to develop.

View Project
Natale – Robinvale Avocados

Natale – Robinvale Avocados

November 17, 2015IrribizNo comments

A local Robinvale project sees us develop 22.6 acres for Avocados with low levels, overheads and mainlines with filter, control and valve assemblies. Its projects like this we love doing as we see the results immediately and positively impact the family and community.

View Project
Zara – Robinvale Table Grapes

Zara – Robinvale Table Grapes

November 17, 2015IrribizNo comments

Above and below ground works were undertaken in this project for drip and cooling systems as well as a fertigation system. Utilising the expertise of our installers an designers meant we could deliver this project with a quick turnaround.

View Project
Tenandra Irrigation Scheme Upgrade

Tenandra Irrigation Scheme Upgrade

July 21, 2015IrribizNo comments

Irribiz Involvement Designed and supplied 2 River Pump Stations on the Macquarie River for supply of water to the Tenandra channel system; 2 x 130meg/day Angle application turbine pumps 3 x 80meg/day Angle application turbine pumps Designed and supplied 4 Syphons that joined channels together that were intercepted by creeks; 720m of 800mm poly that included a float and sink...

View Project
Trangie Nevertire Irrigation Scheme

Trangie Nevertire Irrigation Scheme

July 21, 2015IrribizNo comments

Irribiz Involvement Installation of 150km of PVC pipeline for Stock & Domestic water (ranging from 300mm to 100mm in size) Installation of 157km, around 2,430,000m2, of Firestone GeoGard (rubber) Geomembrane liner for the irrigation supply channel

View Project
Websters – Avondale West Walnuts

Websters – Avondale West Walnuts

July 20, 2015IrribizNo comments

Irribiz Involvement Avondale West development consists of 876 ha (planted) in total and is divided into quarters developed by Irribiz over 3 years 220ha – 2014 440ha – 2015 216ha – 2016 Pump Station on Wah Wah Supply Channel completed with a 710mm Rising mainline back to Dam Dam pump station completed with Electrical and automation equipment 2 x 180l/s pumps 2 x Omega 2E...

View Project
Timbercorp/Olam Projects

Timbercorp/Olam Projects

June 17, 2015IrribizNo comments

Over the years, and in the early days of Irribiz, we worked primarily on Timbercorp projects in Victoria. We are proud to have continued the relationship with Olam Orchards, post Timbercorp, as locals in the region, we had spent so much time developing their investments.