Select Harvests Mullroo Project Completion

Select Harvests Mullroo Project Completion

On the Sturt Highway between Renmark/Paringa and Mildura you’ll pass through Lake Cullulleraine. Although a small town with minimal services there is a great lakeside Caravan Park, rest stop and now two new pump stations and rising main feeding Select Harvests new Almond farm.

By all reports at this early stage, both the client and Irribiz are exceptionally happy with their two new TKL Hydro-Titan Electric pumps feeding the 575-630mm pipeline to the farm. This combination will supply 460lps of water from the canal system connected to the Murray River just above Lock 9.

Further project details can be found here.