Olam - Tocabil Almond Orchard

Olam - Tocabil Almond Orchard

Project Description

A total of approximately 610ha will be developed in two stages, with the 2015 Stage 1 consisting of 419ha and the remaining 190ha planned for 2016. The Tocabil property is located approximately 40kms NE of Hillston on the Cobar Road (Kidman Way).

The scope of work for this project included a dam pump station, filtration and the internal irrigation system for the Stage 1 plantings of approximately 419ha.

  • Dam pump station, including filtration and fertigation system
  • PE and PVC mainlines
  • Isolation valves, air valves and purge valves
  • Backup filters and control valve assemblies
  • Submains
  • Laterals
  • Collection manifolds
  • Automation